Feasibility study of Cogeneration for PG Asembagus and PG Jatiroto
2018
Team Member
PTPN XI
Feasibility study of Decanter in 5 palm oil mill
2018
Team Leader
PTPN V
Feasibility study of Steam Turbine in PKS Sei Buatan
2018
Team Leader
PTPN V
Feasibility study of Steam Turbine for asset release in PG Karangsuwung
2018
Team Member
PTPN V
Feasibility study of PMN funding Reallocation for PTPN X
2018
Team Leader
PTPN X
Analysis of Hydraulic motor and electric motor for mill
2017
Team Leader
PTPN V
Patnership with casetech engineering for consultancy in 5 sugar factories in PTPN XI
2017
Team Leader
PTPN XI
Workshop for maintenance in Kanigoro sugar industry analysis
2017
Team Leader
Kanigoro
Bottleneck PG Industri Gula Glenmore analysis
2017
Team Leader
Glenmore
Feasibility Study of Increasing capaity and modernization PG Asembagus dan PG Jatiroto
2017
Team Member
PTPN XI
Study of Interconnection to PLN grid PT IGG, East Java.
2016
Team Leader
PT IGG
Supervision of Sugar Factory process in PG Rendeng and PG Modjo PTPN IX.
2015
Team Leader
PTPN IX
Instrumentation and Automation Audit of 9 Sugar Factory in PTPN X.
2009
Team Leader
PTPN X
Design and Supervision of Electrical Electrical and instrumentation System, carbonatation to sulfitation PG Tasik Madu PTPN IX
2006
Team Leader
PTPN IX
Design and application of Autocane feeding control System PG Tersana Baru, PG Sindang Laut, PG Subang (Rajawali Nusantara II), PG Tjoekir, PG Watu Tulis, PG Modjopanggung (PTPN X).
2003
Team Leader
PTPN X
Supervision of Sugar Factory Maintenance and Process Test In PG Ngadirejo PTPN X.
2010
Team Leader
PTPN X